Reduce Scrapping and Smelting, Promote Component Reuse   >   Complete Machines   >   1900 1920   >   DuPage County   >   New   >   New aldon train rail double steel chock with flag

New aldon train rail double steel chock with flag


New, old stock. Aldon Train Rail Double Steel Chock With Flag. These came out of parts crib of a closed down facility.
ALDON WHEEL CHOCKS MEET OSHA REGULATIONS 1910.110 (15); 1910.111 (13); 1910.30 (A) (5)
OSHA REGULATIONS REQUIRE THAT CAR BRAKES ARE APPLIED AND A WHEEL CHOCK IS IN PLACE BEFORE A CAR CAN BE SAFELY WORKED. SET THE CAR BRAKE FIRST AND THEN INSTALL THE WHEEL CHOCK. A CHOCK ALONE WILL NOT HOLD THE CAR. USE 2 CHOCKS PER CAR BEING CHOCKED. IF YOUR TRACK HAS A DIP OR HOLLOW, YOU MAY HAVE TO TAKE ADDITIONAL PRECAUTIONS.



New aldon train rail double steel chock with flag